Advertisement

Offshore Wind

about 12 years ago

AREVA’s Installed Offshore Wind Capacity Reaches 630MW

The erection of 80 AREVA wind turbines was successfully completed at the Global Tech I wind farm with the last rotor star installation finalized on Friday. The commissioning of turbines can begin when the grid connection is available. AREVA’s 5 Megawatt M5000-116 turbines were manufactured at the Gr

1 minutes read

The erection of 80 AREVA wind turbines was successfully completed at the Global Tech I wind farm with the last rotor star installation finalized on Friday.

The commissioning of turbines can begin when the grid connection is available.

AREVA’s 5 Megawatt M5000-116 turbines were manufactured at the Group’s Bremerhaven and Stade sites, in northern Germany.

“The Group’s installed base now reaches 630 MW for offshore wind,” said Arnaud Bellanger, CEO of AREVA Wind . “This solid base founded on a proven technology, along with the creation of our joint-venture announced with GAMESA further consolidates AREVA’s position as a key player on the European offshore wind market.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.