Advertisement

Fossil Energy

about 12 years ago

BG makes Kamba-1 discovery, offshore Tanzania

BG Group, a UK-based oil and gas exploration and production company, has made a gas discovery at the Kamba-1 well, offshore Tanzania. According to Ophir Energy, a partner in the discovery, the Kamba-1 well in Block 4 has resulted in gas discoveries of 1.03TCF in the Kamba and Fulusi prospects. BG op

3 minutes read

BG Group, a UK-based oil and gas exploration and production company, has made a gas discovery at the Kamba-1 well, offshore Tanzania.

According to Ophir Energy, a partner in the discovery, the Kamba-1 well in Block 4 has resulted in gas discoveries of 1.03TCF in the Kamba and Fulusi prospects. BG operates the Block 4 licence and Ophir holds a 20% interest. The well was drilled by the Deepsea Metro I drillship in a water depth of 1,379m to a total depth of 3,969m with the twin objectives of intersecting the Paleocene-aged Fulusi prospect (a northern extension of the earlier Pweza discovery) and the primary target of the Cretaceous-aged Kamba prospect.

The Kamba-1 well encountered an 18m gross gas column in the Fulusi prospect and, after sidetracking to test the Kamba prospect, the Kamba-1ST well established another gas column of 140m with high net to gross, good quality, reservoir sands.

The well has encountered better quality reservoir sands than prognosed pre-drill and further analysis is expected to confirm discovered volumes somewhat in excess of the pre-drill estimated mean (2C) recoverable resources of 1.03TCF, comprised of 650bcf in Kamba and 380bcf in Fulusi.

The Kamba-1 discovery is the Joint Venture’s 16th consecutive discovery well in Blocks 1, 3 and 4. This discovery, plus recent volume updates on the earlier discoveries, increases Ophir’s estimate of the total Block 1, 3 and 4 mean (2C) recoverable resource to 17.1TCF. The Kamba-1 result provides critical mass for an LNG train to be supplied from the fields in Block 4 and also takes the overall resource volume to the threshold for a future potential third LNG train to be from Blocks 1 and 4.

The Kamba-1 well represents the Joint Venture’s final well in this current drilling campaign. The Deepsea Metro I drillship will remain in Tanzania and now moves to drill two operated wells for Ophir in the East Pande and Block 7 PSCs.

Nick Cooper , CEO, commented: “The Kamba discovery has now confirmed sufficient aggregate resource in Block 4 to supply one 5MMTPA train of LNG. In combination with the discovered resource in Block 1, the Block 1 and 4 Joint Venture is now close to the threshold resource volumes for three 5MMTPA LNG trains.”

Advertisement

Ophir has said it will imminently spud the Tende-1 well on the East Pande licence.

Ophir operates the East Pande licence and holds a 70% interest, the East Pande PSC is located between the coast and the significant gas discoveries in Blocks 1 and 2.The Tende-1 well is on trend with the recent Taachui-1 discovery in Block 1 at a water depth of 680m and will be drilled to a planned total depth of 4,200m. The well is targeting gas in a lower Cretaceous sandstone reservoir with a mean prospective resource estimate of 2.38TCF at a 15% chance of success. Drilling operations are expected to take approximately 35 days.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.