Advertisement

Wind Farms

about 12 years ago

Anholt Cable Fault Identified

Energinet.dk has located the problem at Anholt offshore wind farm’s connection to the grid. Namely, the fault was pinpointed four miles from Grenaa. The Danish grid operator said it is now preparing to repair the cable by cutting out the damaged section and connecting a new cable section with two sl

1 minutes read

Energinet.dk has located the problem at Anholt offshore wind farm’s connection to the grid.

Namely, the fault was pinpointed four miles from Grenaa. The Danish grid operator said it is now preparing to repair the cable by cutting out the damaged section and connecting a new cable section with two sleeves.

However, the cause of the problem which kept Dong’s wind farm offline since Tuesday morning is yet not clear.

Energinet.dk expects the cable to be fixed by Monday (6. October), thus putting Anholt wind farm back online.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.