Subsea

about 12 years ago

Robin Rigg Bathymetric Survey Complete

The Bathymetric Survey at the Robin Rigg Wind Farm is now complete and the 12 meter Catamaran ‘Norfolk Swift’ has demobilised from this site. A general maintenance programme will continue with the transfer of technicians out to selected Turbines by Crew Transfer/ Secondary Work Vessels on a daily ba

1 minutes read

The Bathymetric Survey at the Robin Rigg Wind Farm is now complete and the 12 meter Catamaran ‘Norfolk Swift’ has demobilised from this site.

A general maintenance programme will continue with the transfer of technicians out to selected Turbines by Crew Transfer/ Secondary Work Vessels on a daily basis as and when required.

There are now 6 Crew Transfer / Secondary Work Vessels connected to this Wind Farm:

The EON Service Vessels ‘Solway Spirit’ and ‘Solway Challenger’ have been joined by ‘Rhoscolyn Head’, ‘Porth Wen’, ‘Porth Cadlan’ and ‘Lynas Point’ and a wide berth is requested around these vessels at all times while on site.

None of their work is expected to interfere with any other vessels and all work will be dependent on weather conditions.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.