Advertisement

Offshore Wind

about 12 years ago

Lely Shut Down as Nuon Investigates Turbine Malfunction

One of the wind turbines at Lely wind farm lost its head and blades last week. Nuon shut down the wind farm as it was planning launch an investigation and salvage operation. The cause of the breakdown is not yet known, as the operator claims the wind turbines are inspected twice a year while the [&h

1 minutes read

One of the wind turbines at Lely wind farm lost its head and blades last week.

Nuon shut down the wind farm as it was planning launch an investigation and salvage operation.

The cause of the breakdown is not yet known, as the operator claims the wind turbines are inspected twice a year while the last check was made last summer.

Lely wind farm, located around 800meters off Ijsselmeer shore, was commissioned in 1994 and will resume operation when the cause of Nedwind N40/500 malfunction is discovered.

Offshore WIND Staff; Image: Nuon

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.