Fossil Energy

about 11 years ago

Technip nets two Stone Energy deals

Technip has been awarded by Stone Energy Corporation both a flexible pipe supply contract and an installation contract for the Amethyst field, located on Mississippi Canyon 26, in the Gulf of Mexico. The first contract includes the detailed engineering, procurement, fabrication, assembly and testing

1 minutes read

Technip has been awarded by Stone Energy Corporation both a flexible pipe supply contract and an installation contract for the Amethyst field, located on Mississippi Canyon 26, in the Gulf of Mexico.

The first contract includes the detailed engineering, procurement, fabrication, assembly and testing of a 5-inch production static riser (almost 9 kilometers long) as well as all associated hardware.

The second award covers the installation of the pipe as a tieback to the Pompano fixed platform, in approximately 395 meters of water depth.

Technip says that its operating center in Houston, Texas, USA, will manage the project which is scheduled to be completed during the second half of 2015.

The flexible pipe will be manufactured at the Group’s Asiaflex Products plant located in Tanjung Langsat, Malaysia. It will be installed using the Deep Blue, Technip’s deepwater pipelay vessel.

Deanna Goodwin , President of Technip in North America, stated: “Technip is proud to bring its experience and to leverage its vertical integration of product design and manufacture and installation vessel fleet to support our customer’s needs.”

[mappress mapid=”1138″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.