Advertisement

Subsea

about 11 years ago

Hydrex Dives in South Korea

Hydrex was contacted to install a doubler plate over a crack in flat bottom plating of one of the water ballast tanks of a 225-meter bulk carrier during her stop in Yeosu, South Korea. Shortly after arriving at the location, Hydrex diver/technicians performed an underwater inspection to make a full

1 minutes read

Hydrex was contacted to install a doubler plate over a crack in flat bottom plating of one of the water ballast tanks of a 225-meter bulk carrier during her stop in Yeosu, South Korea.

Shortly after arriving at the location, Hydrex diver/technicians performed an underwater inspection to make a full assessment of the damage.

Next, the team prepared the area around the crack for the installation of the doubler plate. Crack arrests were burned on both sides of the crack to stop it from growing bigger. The plate was then welded in place over the damaged area on the underwater hull

The repair was performed according to the Hydrex class approved procedures. As in all operations we carry out, essential professional standards were upheld to ensure the future safety of the ship.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.