Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›VAALCO takes first oil from 2nd Etame well (Gabon)
Fossil Energy

February 11, 2015 · about 11 years ago

VAALCO takes first oil from 2nd Etame well (Gabon)

VAALCO Energy has announced first production from Etame 10-H, the second development well drilled from the newly installed Etame platform, offshore Gabon. The horizontal development well was drilled to a Measured Depth (MD) of 3,144 meters while intersecting over 180m of high quality reservoir withi

2 minutes read
  • LinkedIn
  • X
  • Email

VAALCO Energy has announced first production from Etame 10-H, the second development well drilled from the newly installed Etame platform, offshore Gabon.

The horizontal development well was drilled to a Measured Depth (MD) of 3,144 meters while intersecting over 180m of high quality reservoir within an oil-bearing portion of the Gamba Sand.

Following completion operations, the well was tested at the rate of approximately 3,200 BOPD on a gross basis with negligible amounts of water and no hydrogen sulfide (H2S). The well is currently being produced at approximately 3,000 BOPD.

“We are very pleased with the results from the Etame 10-H well and we are eager to continue our current drilling program offshore Gabon,” said Steve Guidry , CEO of VAALCO. “VAALCO has produced over 85 million barrels of oil from the Etame Marin block and, with our two new platforms, we are well positioned to continue to deliver a growing production profile through most of 2015.”

The contracted jack-up rig, the Transocean “Constellation II”, is now being mobilized to drill additional development wells from the Southeast Etame/N. Tchibala (“SEENT”) platform, beginning with the Southeast Etame 2-H well in the Southeast Etame field, where the company and its partners drilled an exploration well in 2010.

Following the mobilization of the jack-up rig to the SEENT platform, VAALCO is planning to conduct an extended well test of the Etame 8-H well, drilled in the fourth quarter of 2014, to confirm and quantify the presence of H2S, which was detected during the initial 17 hour flow test. The well test is expected to occur later in the first quarter of 2015.

[mappress mapid=”1228″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyExploration & ProductionProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1$50 billion South Korean investment pushes stalled Alaska LNG project closer to construction
  2. 2TGS on 3D imaging mission to unlock new insights into Malaysia's offshore discovery
  3. 3Petrobras strikes another oil-bearing zone in Equatorial Margin frontier
  4. 4MidOcean gets hold of $4 billion in major capital raise to fuel global LNG push

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free