Dredging

about 11 years ago

Preparations Underway for Cabot Route 2 Scheme

The Vermont Agency of Transportation (AOT) is seeking a permit from the U.S. Army Corps of Engineers, New England District, to conduct work in waters of the U.S. in conjunction with repairing a portion of U.S. Route 2 in Cabot, Vermont. The Vermont Agency of Transportation proposes to place fill mat

1 minutes read

The Vermont Agency of Transportation (AOT) is seeking a permit from the U.S. Army Corps of Engineers, New England District, to conduct work in waters of the U.S. in conjunction with repairing a portion of U.S. Route 2 in Cabot, Vermont.

The Vermont Agency of Transportation proposes to place fill material in a total of 6.74 acres of waters of the U.S. in conjunction with the reconstruction of about 1.49 miles of U.S. Route 2 in Cabot.

This work is proposed in Molly’s Brook, Hooker Brook, several unnamed tributaries and wetlands adjacent to these waterways off of U.S. Route 2 in Cabot.

Proposed work includes the discharge of dredged or fill material for the reconstruction of about 1.49 miles of U.S. Route 2. New bridge crossings of Molly’s Brook and Hooker Brook, and new culverted crossings of five unnamed tributaries will impact a total of 0.09 acre of stream bottom below Ordinary High Water.

[mappress mapid=”20185″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.