Advertisement

Fossil Energy

about 11 years ago

SCV Far Sleipner delivered to Farstad

Farstad Shipping ASA has today, March 26, 2015, taken delivery of subsea-/construction vessel Far Sleipner (Vard 3 07) from Vard Langsten. The vessel is designed for subsea construction/IMR operations to 3,000 meters water depth, has an overall length of 142.6 meters, beam of 25 meters and a deck ar

1 minutes read

Farstad Shipping ASA has today, March 26, 2015, taken delivery of subsea-/construction vessel Far Sleipner (Vard 3 07) from Vard Langsten.

The vessel is designed for subsea construction/IMR operations to 3,000 meters water depth, has an overall length of 142.6 meters, beam of 25 meters and a deck area of 1,800 m². The vessel is equipped with two offshore cranes, of which the larger one has a lifting capacity of 350 tons. Furthermore, the vessel is arranged for 3 pc ROV (Remote Operating Vehicles) and accommodation for 130 persons.

The vessel will enter into a charter contract to Technip for a period of approx. 11 months, divided into two firm periods. Including mobilization and demobilization, Technip may utilize the vessel for a period up to 16 months.

The long-term financing of the vessel is arranged by Eksportkreditt Norge AS, DNB, Swedbank and GIEK.

[mappress mapid=”1457″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.