Advertisement

Clean Fuel

about 11 years ago

Origin progresses with BassGas MLE

Origin Energy, as operator of the BassGas joint venture, informed that the Yolla-6 production well, had reached total depth of 3,653m MDRT (Measured Depth Below Rotary Table).

1 minutes read

Origin Energy, as operator of the BassGas joint venture, informed that the Yolla-6 production well, had reached total depth of 3,653m MDRT.

The well was drilled using the West Telesto jack up rig, which will move back to complete drilling of the Yolla-5 well. The Yolla-5 and Yolla-6 wells are being drilled as part of Stage 2 of the BassGas Mid Life Enhancement project.

Yolla-6 will be cased and completed before being commissioned for production via the BassGas production facility at Lang Lang, Victoria.

The wells are being drilled from the Yolla Platform which is located in Bass Strait, approximately 140km offshore from Kilcunda, Victoria.

[mappress mapid=”16942″]

Image: Origin Energy

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.