Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Marine Energy›SRP Rocksteady anchors CETO 5 units
Marine Energy

May 13, 2015 · about 11 years ago

SRP Rocksteady anchors CETO 5 units

Rocksteady mooring connector has been operating for more than six months as part of the Perth Wave Energy Project. Rocksteady mooring connector was provided for the wave project by Subsea Riser Products (SRP). Rocksteady is an auto-latching subsea structural connector with a locking/preload mechanis

2 minutes read
  • LinkedIn
  • X
  • Email

Rocksteady mooring connector has been operating for more than six months as part of the Perth Wave Energy Project.

Rocksteady mooring connector was provided for the wave project by Subsea Riser Products (SRP).

Rocksteady is an auto-latching subsea structural connector with a locking/preload mechanism operated by either an ROV or hydraulic stab – as in this project.

After a quick auto-latch, the locking mechanism then transfers the connection load through forged fingers and a load shoulder, generating a high clamping force (or preload) in the mating parts.

According to SRP, the preload increases Rocksteady’s fatigue performance and accommodates bending, tension, shear and torsion loads.

David Kessel , Carnegie Supply Chain and IMS Manager, said: “During the first unit installation, the Rocksteady connector automatically latched when fully inserted in the receptacle.

“It was then preloaded to survive the cyclic wave loading. Carnegie required a one-day (port-to-port) installation and met this target with the installation of the second and third CETO units, in which the Rocksteady played a vital role.”

With all three CETO 5 units now installed, the Rocksteady subsea mooring connectors, with a maximum breaking load (MBL) of 2.000 tonnes, have been in operation for more than six months in sea states of up to 3.5 m wave height.

Carnegie has connected the Perth Wave Energy Project to the Australian grid in February. Following the connection to the gird, the third and final CETO 5 unit was installed completing the full array of the devices.

Carnegie Wave plans to perform the subsea disconnection of the first installed CETO 5 unit to conduct an onshore inspection of the device in the upcoming weeks.

SRP is part of the Acteon group of companies that designs and supplies hardware for the offshore oil and gas and renewables industries.

[mappress mapid=”416″]

Image: Subsea Riser Products

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Marine EnergyBusiness & FinanceOperations & MaintenanceTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 122-year Cheniere-Petrobras LNG pact expands energy bridge between North and South America
  2. 2Next chapter of Shell’s Canadian LNG project brings Fluor-JGC JV multibillion-dollar award
  3. 3Subsea production systems for Mozambique’s deepwater LNG project ordered from OneSubsea
  4. 4Shell’s platform departs for Trinidad & Tobago’s offshore realm as NGC locks in gas from two upcoming projects

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free