Advertisement

Fossil Energy

about 11 years ago

CNOOC in production kickoff from Luda 10-1 project

CNOOC Limited today announced that the Luda 10-1 comprehensive adjustment project, offshore China, has started production. The Luda 10-1 oilfield is located in Liaodong Bay of Bohai with an average water depth of approximately 30 meters. In addition to fully utilizing the existing facilities of Luda

1 minutes read

CNOOC Limited today announced that the Luda 10-1 comprehensive adjustment project, offshore China, has started production.

The Luda 10-1 oilfield is located in Liaodong Bay of Bohai with an average water depth of approximately 30 meters.

In addition to fully utilizing the existing facilities of Luda 10-1, CNOOC said that this adjustment project has also built one wellhead platform. There are currently 13 producing wells producing approximately 3,300 barrels of crude oil per day.

The adjustment project is expected to reach its ODP designed peak production of approximately 6,000 barrels of crude oil per day in 2016.

The Luda 10-1 is an independent oilfield in which the company holds 100% interest and acts as the operator.

[mappress mapid=”2214″]

Advertisement

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.