Advertisement

Subsea

about 11 years ago

Ichthys LNG Project Lowers Three More Production Manifolds

INPEX-operated Ichthys LNG Project has seen three more subsea production manifolds safely and successfully landed on the seabed, bringing the total to four. The first of five production manifolds was lowered in June 2015. Located about 220 kilometres offshore Western Australia, Ichthys represents th

1 minutes read

INPEX-operated Ichthys LNG Project has seen three more subsea production manifolds safely and successfully landed on the seabed, bringing the total to four.

The first of five production manifolds was lowered in June 2015.

Located about 220 kilometres offshore Western Australia, Ichthys represents the largest discovery of hydrocarbon liquids in Australia in 40 years.

According to the company, the 435-ton manifolds were installed in around two days, landed within tolerances and ahead of schedule.

When operational, five manifolds will commingle production from the subsea wellheads, distributing to the project’s central processing facility via 18 inch flowlines and flexible risers.

This is part of a campaign to install more than 30,000 tonnes of subsea infrastructure and equipment across the Field.

Advertisement

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.