Dredging

about 11 years ago

Bertrand Levees Project Kicks Off

Repairs to the Bertrand Creek levees started yesterday as the U.S. Army Corps of Engineers’ officials commenced construction on six separate sites, totaling 1,500 feet, located on the left and right banks of Bertrand Creek near Lynden, Washington. Damages were caused during a January 2015 flood even

1 minutes read

Repairs to the Bertrand Creek levees started yesterday as the U.S. Army Corps of Engineers’ officials commenced construction on six separate sites, totaling 1,500 feet, located on the left and right banks of Bertrand Creek near Lynden, Washington.

Damages were caused during a January 2015 flood event which overtopped a levee causing erosion, scour, sloughing and a loss of riprap armor.

In addition, seepage was observed on the landward slope and levee toe prior to overtopping. In their damaged condition, the levees’ level of flood protection was reduced from a 5-year flood protection level to just a one-year level.

Repairs include restoring the levee embankment material and placing armor rock to reduce potential flood damage to protect the levees from high flows.

Construction on the $410,000 project is expected to be complete by mid-September, restoring the levees to their pre-flood level of protection.

Under a cost share agreement, the Corps pays for 80 percent of project costs and Whatcom County Flood Control Zone District picks up the remaining 20 percent as the non-federal sponsor.

[mappress mapid=”21031″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.