Advertisement

Subsea

about 11 years ago

CGG Q3 Fleet Production Rate at 92 Pct

French seismic contractor, CGG, has seen its vessel availability rate at 84 per cent, compared to a 74 per cent availability rate in the first quarter of 2015 and a 92 per cent rate in the second quarter of 2014. The vessel production rate was 92 per cent, compared to a historic high 94 per [&hellip

1 minutes read

French seismic contractor, CGG, has seen its vessel availability rate at 84 per cent, compared to a 74 per cent availability rate in the first quarter of 2015 and a 92 per cent rate in the second quarter of 2014.

The vessel production rate was 92 per cent, compared to a historic high 94 per cent production rate in the second quarter of 2015 and a 92 per cent rate in the third quarter of 2014.

CGG’s vessel availability rate, is a metric measuring the structural availability of its vessels to meet demand, while the vessel production rate is a metric measuring the effective utilization of the vessels once available.

During the third quarter of 2015, CGG 3D vessels were allocated 33 per cent to multi-client programs.

The transformation plan CGG launched in 2013 to adapt to the new environment and market conditions has led to downsizing of its fleet from 18 to 11 vessels.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.