Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Marine Energy›AW-Energy launches PTO testing facility
Marine Energy

November 20, 2015 · about 11 years ago

AW-Energy launches PTO testing facility

AW-Energy, a Finnish wave energy developer, has inaugurated a new wave energy testing facility built in collaboration with ABB, a power and automation technology group. The facility is located in Järvenpää, Finland, and comprises a 1.5 MW grid-connected wave energy test site designed to develop, tes

1 minutes read
  • LinkedIn
  • X
  • Email

AW-Energy, a Finnish wave energy developer, has inaugurated a new wave energy testing facility built in collaboration with ABB, a power and automation technology group.

The facility is located in Järvenpää, Finland, and comprises a 1.5 MW grid-connected wave energy test site designed to develop, test and tune power take-off (PTO) systems.

According to ABB, it provided the facility with automation solutions based on programmable controllers that govern AW-Energy’s WaveRoller wave energy converter.

The collected information on WaveRoller’s performance is later used to develop control algorithms for the device.

AW-Energy has developed WaveRoller wave energy device that works when the back and forth movement of water driven by wave surge puts the panel into motion, which triggers the hydraulic piston, attached to the panel, to pump the hydraulic fluids inside a closed hydraulic circuit.

The high-pressure fluids are fed into a hydraulic motor that drives an electricity generator, producing electricity, which is then fed to the grid via subsea cable.

The 350 kW commercial scale WaveRoller device has recently been validated by DNV GL and Lloyd’s Register , and the device is planned for deployment in 2016.

Image: AW-Energy

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Marine EnergyOperations & MaintenanceResearch & DevelopmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Centrica secures two-decade-long LNG supply from Canadian project
  2. 2Digital twin technology to help improve safety of ammonia-fueled vessels
  3. 3Serica’s UK gas footprint widens as it brings Spirit Energy's North Sea assets into its fold
  4. 4Boskalis to install inter-array cables at 1 GW Dutch offshore wind farm

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free