Advertisement

Subsea

about 11 years ago

PHOTO: Normand Maximus Arrives for Final Outfitting

The BN 830 offshore subsea construction vessel Normand Maximus has arrived at Vard Brattvaag in Norway for final outfitting. The hull, of VARD 3 19 design, comes from Vard Tulcea in Romania. It started its journey to Norway following the launch in November this year. The 178 meters long vessel will

1 minutes read

The BN 830 offshore subsea construction vessel Normand Maximus has arrived at Vard Brattvaag in Norway for final outfitting.

The hull, of VARD 3 19 design, comes from Vard Tulcea in Romania. It started its journey to Norway following the launch in November this year.

The 178 meters long vessel will become the largest in Solstad’s fleet.

After the delivery in Q2 2016, Normand Maximus will work for Saipem on an 8-year charter agreement.

Reportedly, the Italian contractor aims to combine SURF installation with field development activities in ultra-deep water.

The vessel will feature a 550-ton top tension vertical lay-system, enabling the installation of large diameter flexible pipes in ultra-deepwater environments, and be equipped with a 900 ton active heave compensated offshore crane and a 4.000 ton under-deck carousel for storage of flexible pipes, cables and umbilical’s.

Advertisement

Subsea World News Staff; Photo: Solstad

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.