Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›DONG Orders MHI Vestas’ 8MW Turbines for Walney Extension West
Wind Farms

December 16, 2015 · about 10 years ago

DONG Orders MHI Vestas’ 8MW Turbines for Walney Extension West

MHI Vestas Offshore Wind has received an order from DONG Energy for the supply of V164-8.0 MW turbines for the 330MW Walney Extension West project in the UK. The order includes a five-year full-scope service contract with an availability guarantee, ensuring optimised performance of the wind power pl

2 minutes read
  • LinkedIn
  • X
  • Email

MHI Vestas Offshore Wind has received an order from DONG Energy for the supply of V164-8.0 MW turbines for the 330MW Walney Extension West project in the UK.

The order includes a five-year full-scope service contract with an availability guarantee, ensuring optimised performance of the wind power plant with maximum power output. The V164-8.0 MW turbines, rated with a capacity of 8MW, have been optimised for the Walney Extension West project, utilising a power mode to be able to deliver a maximum output of 8.25MW.

The project represents the second order for the V164-8.0 MW, and with 40 turbines it will be the largest 8MW project to date, MHI Vestas said.

MHI Vestas’ CEO Jens Tommerup said: “This will be the second project to use the V164-8.0 MW and our order backlog together with DONG Energy now stands at 588 MW, which demonstrates the confidence the customer has in our technology and our company.

“Furthermore the use of a power mode demonstrates our ongoing focus of optimising our technology, continuing to provide greater value for our customers.”

Blades for the project will be produced at the MHI Vestas factory on the Isle of Wight, where over 200 employees commenced serial production of 80m blades for the Burbo Bank Extension project in May 2015.

“The prototype blades for the V164-8.0 MW were designed, manufactured and tested at the Isle of Wight facility and we have developed the unique skills and processes necessary to ramp up serial production,” Tommerup said.

The Walney Extension project is located in the Irish Sea, approximately 35km northwest from the Fleetwood and Blackpool coast. The Walney Extension West will be the first phase of the 660MW Walney Extension offshore wind farm project.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1$50 billion South Korean investment pushes stalled Alaska LNG project closer to construction
  2. 2TGS on 3D imaging mission to unlock new insights into Malaysia's offshore discovery
  3. 3Petrobras strikes another oil-bearing zone in Equatorial Margin frontier
  4. 4MidOcean gets hold of $4 billion in major capital raise to fuel global LNG push

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free