Advertisement

Offshore Wind

about 10 years ago

Pacific Orca Picking Up Last Sandbank Foundations

Jack-up vessel Pacific Orca has arrived at the Port of Esbjerg to carry out the last load-out of monopiles and transition pieces for the Sandbank offshore wind farm. After all 72 foundations are in place, the installation of Siemens 4 MW wind turbines will begin. This will also be done also from the

1 minutes read

Jack-up vessel Pacific Orca has arrived at the Port of Esbjerg to carry out the last load-out of monopiles and transition pieces for the Sandbank offshore wind farm.

After all 72 foundations are in place, the installation of Siemens 4 MW wind turbines will begin. This will also be done also from the base port in Esbjerg.

The 288 MW Sandbank offshore wind farm is planned to be fully commissioned in 2017.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.