Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›World’s Largest OW Jack-Up Vessel Installs World’s Heaviest Monopile at Veja Mate OWF
Wind Farms

April 6, 2016 · about 10 years ago

World’s Largest OW Jack-Up Vessel Installs World’s Heaviest Monopile at Veja Mate OWF

Offshore construction of the Veja Mate offshore wind farm has started with Seajacks Scylla having installed the heaviest monopile produced so far at the project site, according to DGI Doedijns, which provided hydraulic and software equipment for the pile-gripper used at the project. The Scylla, deem

1 minutes read
  • LinkedIn
  • X
  • Email

Offshore construction of the Veja Mate offshore wind farm has started with Seajacks Scylla having installed the heaviest monopile produced so far at the project site, according to DGI Doedijns, which provided hydraulic and software equipment for the pile-gripper used at the project.

The Scylla, deemed the world’s largest and most advanced wind farm installation vessel, arrived at the site on Friday, 1 April, and installed the first monopile during the weekend.

The 1,302.5-tonne monopile, which is 82.2 metres long and has a diameter of 7.8 metres, was manufactured by EEW Special Pipe Constructions GmbH in Rostock.

Scylla will now continue the installation of the remaining 66 monopiles at the construction site, located 95 kilometers northwest from the island of Borkum in the German North Sea. Another Seajacks’ vessel – Seajacks Zaratan, will install transition pieces . “ This set up of installing monopiles and TPs from separate installation jack ups was very successful on Blackstone’s 288MW Meerwind project and I am sure it will be the same here,” Seajacks CEO Blair Ainslie explained in November 2015.

Veja Mate will feature 67 Siemens 6MW turbines, which will be installed by Fred. Olsen Windcarrier, starting from early 2017.

The EUR 1.9 billion project is scheduled to be fully operational in late 2017/ early 2018.

EEW SPC Rolls Out World’s Heaviest Monopile

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1$50 billion South Korean investment pushes stalled Alaska LNG project closer to construction
  2. 2TGS on 3D imaging mission to unlock new insights into Malaysia's offshore discovery
  3. 3Petrobras strikes another oil-bearing zone in Equatorial Margin frontier
  4. 4MidOcean gets hold of $4 billion in major capital raise to fuel global LNG push

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free