Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›Tideway Nets Hornsea One Cable-Laying Contract
Wind Farms

June 14, 2016 · about 10 years ago

Tideway Nets Hornsea One Cable-Laying Contract

Tideway BV has been awarded a Design and Build cable installation contract by DONG Energy for the Hornsea Project One offshore wind farm. For the project, Tideway, a subsidiary of DEME, will deploy the new DP3 cable-laying vessel Living Stone, which is currently being built by the Spanish shipyard L

2 minutes read
  • LinkedIn
  • X
  • Email

Tideway BV has been awarded a Design and Build cable installation contract by DONG Energy for the Hornsea Project One offshore wind farm.

For the project, Tideway, a subsidiary of DEME, will deploy the new DP3 cable-laying vessel Living Stone, which is currently being built by the Spanish shipyard LaNaval and is scheduled to be delivered in April 2017.

The installation scope of work for Tideway includes cable-laying, pre-trenching, backfilling, pre-sweeping, route preparation and rock placement of three high voltage subsea power cables from the shore to three different offshore substation platforms, as well as the installation of two interlink cables.

The power cables will be pulled ashore near Horseshoe Point immediately south of the Humber Estuary.

Due to the extreme length of the three subsea power cables (134 km, 140 km and 152 km), DONG Energy has to install a reactive compensation platform between the three substations and the shore. The interlink cables are 13 km and 14 km.

The offshore project execution will start in 2017 with the engineering route survey and the last export cable will be laid and protected mid 2019.

DONG Energy will build the Hornsea Project One offshore wind farm, capable of powering well over 1 million UK homes, off the Yorkshire Coast in the UK. Covering approximately 407 square kilometres and providing a capacity of 1.2 gigawatts (GW), Hornsea Project One will be the first offshore wind farm to exceed 1 GW in capacity and will become the world’s largest offshore wind farm.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1$50 billion South Korean investment pushes stalled Alaska LNG project closer to construction
  2. 2TGS on 3D imaging mission to unlock new insights into Malaysia's offshore discovery
  3. 3Petrobras strikes another oil-bearing zone in Equatorial Margin frontier
  4. 4MidOcean gets hold of $4 billion in major capital raise to fuel global LNG push

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free