Advertisement

Offshore Wind

about 10 years ago

Zwerver II Busy at Burbo Bank Extension

More than 100 mattresses have been installed at the Burbo Bank Extension wind farm during the past 3 weeks, as reported by HvS Dredging Support, whose multi-purpose DP 2 vessel Zwerver II is deployed at the site. The vessel is being utilized by DeepOcean, which is carrying out the mattress installat

1 minutes read

More than 100 mattresses have been installed at the Burbo Bank Extension wind farm during the past 3 weeks, as reported by HvS Dredging Support, whose multi-purpose DP 2 vessel Zwerver II is deployed at the site.

The vessel is being utilized by DeepOcean, which is carrying out the mattress installation using its Intelligence Mattress Installation Frame, with Jan De Nul Group in charge of the installation and burying of the 25km long export cable between the wind farm’s offshore substation and the beach.

Zwerver II also supported the pull-in of the export cable.

The vessel was built by Gebroeders Kooiman shipyard in Zwijndrecht, according to HvS Dredging Support’s design.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.