Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Marine Energy›Tidetec gearing up for tidal prototype deployment
Marine Energy

September 13, 2016 · about 10 years ago

Tidetec gearing up for tidal prototype deployment

Norwegian tidal technology developer, Tidetec, has completed a structural integrity analysis of its lifting prototype ahead of the upcoming deployment of its tidal energy technology.

2 minutes read
  • LinkedIn
  • X
  • Email

Norwegian tidal technology developer, Tidetec, has completed a structural integrity analysis of its lifting prototype ahead of the upcoming deployment of its tidal energy technology.

With the assistance from Femkuber, a specialist in finite element analysis, structural engineering and design, Tidetec completed a structural integrity analysis, and according to the company, the structure was found to be sound.

However, additional cargo straps to the anchors for the concrete delta blocks will be added for safety, the company informed, to make sure that the delta blocks will be firmly attached to the structure after 4-12 weeks in harsh salt water conditions.

Furthermore, the final sea bed inspection at the prototype installation site in Svelvik, Norway, have been conducted, and conditions at the site are found to be favorable for the deployment.

For the upcoming sea trials, Tidetec will be focused the testing of turning application, and the method of turning the device, not the turbine itself.

The testing is expected to show the robustness of the turning mechanism and the ability to keep the intended areas dry.

In addition, the testing aims to prove that the turret provides a robust housing for a low head hydro turbine, according to Arne Kollandsrud, Tidetec’s Managing Director.

The next steps will be to integrate a suited turbine into the turret, and upscale the technology.

The full size application of Tidetec technology is intended for barrage and tidal lagoon power plants.

As reported earlier, Tidetec is planning a new fundraising in early 2017 to fund engineering of its turret to house a 20MW turbine with a runner diameter of 7.5 meters.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Marine EnergyBusiness & FinanceResearch & DevelopmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1$50 billion South Korean investment pushes stalled Alaska LNG project closer to construction
  2. 2TGS on 3D imaging mission to unlock new insights into Malaysia's offshore discovery
  3. 3Petrobras strikes another oil-bearing zone in Equatorial Margin frontier
  4. 4MidOcean gets hold of $4 billion in major capital raise to fuel global LNG push

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free