Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›Petrofac Hired to Design EA1 OSS Substructure
Wind Farms

September 14, 2016 · about 10 years ago

Petrofac Hired to Design EA1 OSS Substructure

Iberdrola Engineering and Construction UK Limited (IEC) has contracted Petrofac to design the offshore substation jacket foundation for the East Anglia ONE (EA1) offshore wind farm in tandem with IEC as it executes the topsides design. This is Petrofac’s second project on the EA1 project, with its P

1 minutes read
  • LinkedIn
  • X
  • Email

Iberdrola Engineering and Construction UK Limited (IEC) has contracted Petrofac to design the offshore substation jacket foundation for the East Anglia ONE (EA1) offshore wind farm in tandem with IEC as it executes the topsides design.

This is Petrofac’s second project on the EA1 project, with its Project Development group having already completed the basic engineering for IEC earlier this year.

Usman Darr , Director of Engineering Services, Petrofac Engineering & Production Services, said: “This award reflects our growing position in the offshore wind market, where we continue to build on our track record of delivering a strong, technically competent service for our clients.

“This contract builds on our core competence of project development, with our ability to offer a full range of multi-discipline engineering support, including concept, FEED and detailed design services across the oil and gas and renewables industry, onshore and offshore.”

The EA1 wind farm development is located in the southern North Sea within the south eastern area of the East Anglia Zone, approximately 45 km south east of Lowestoft.

The project has a capacity of 714MW, enough to power the equivalent of 500,000 homes or the majority of the households in Suffolk and Norfolk.

Construction is planned to commence in 2017, with the first turbines installed by 2019, and the project is expected to be fully operational during 2020.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1$50 billion South Korean investment pushes stalled Alaska LNG project closer to construction
  2. 2TGS on 3D imaging mission to unlock new insights into Malaysia's offshore discovery
  3. 3Petrobras strikes another oil-bearing zone in Equatorial Margin frontier
  4. 4MidOcean gets hold of $4 billion in major capital raise to fuel global LNG push

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free