Advertisement

Clean Fuel

about 10 years ago

Elengy’s Montoir LNG terminal restarts following emergency shutdown

The Montoir de Bretagne LNG terminal on the French Atlantic coast has been automatically shut down on Wednesday due to a defect controller.

1 minutes read

The Montoir de Bretagne LNG terminal on the French Atlantic coast has been automatically shut down on Wednesday due to a defect on a controller.

By precaution, the company’s internal emergency plan was triggered, in order to stop works in the process area, Elengy, the terminal operator and a unit of Engie said in its statement.

“The Elengy staff was mobilized to recover the control of the process, which should re start normal send out today on the grid, ” the company’s statement reads.

The send-out from the facility stopped on Wednesday at around 9:00 AM, with Elengy saying that operations resumed from 17:30.

The company also recently faced an outage at its two terminals in Fos-sur-Mer, the Fos Tonkin and Fos Cavaou, due to a fire around the industrial zone located about 40km northwest of Marseille.

French LNG terminal operator currently has 19 million tons per annum of natural gas regasification capacity and 840,000 cbm of LNG storage capacity at its three terminals, according to its website.

LNG World News Staff

Advertisement

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.