Advertisement

Subsea

about 10 years ago

Armada Olombendo FPSO Ready for Eni’s East Hub Project

Eni informed that the naming ceremony of the “Armada Olombendo” floating production, storage and offloading (FPSO) vessel was held in Singapore on Friday. The FPSO will operate in Block 15/06, offshore Angola, for the East Hub Development Project. The vessel will soon be ready to sail to its final d

1 minutes read

Eni informed that the naming ceremony of the “Armada Olombendo” floating production, storage and offloading (FPSO) vessel was held in Singapore on Friday.

The FPSO will operate in Block 15/06, offshore Angola, for the East Hub Development Project. The vessel will soon be ready to sail to its final destination where, once in position, will start mooring and hook-up operations, Eni informed.

The first oil from East Hub Development Project is planned by the first half of 2017. This follows the stream of start-ups in the West Hub Project, in the same Block 15/06.

The East Hub Development Project encompasses 9 subsea wells, of which 5 are producers and 4 are water injectors, in water depth ranging between 450 and 550 meters. The hydrocarbons which are produced from these wells will be transported via a pipeline system to the FPSO to be treated and stored prior to export.

Eni is the operator of Block 15/06 with a 36.84% stake. The other partners in the joint venture are Sonangol Pesquisa e Produção (36.84%) and SSI Fifteen Limited (26.32%).

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.