Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Marine Energy›Tidal Sails gears up for final TackReach testing
Marine Energy

October 17, 2016 · about 10 years ago

Tidal Sails gears up for final TackReach testing

Norway-based tidal energy developer, Tidal Sails, is preparing to conduct the final testing of its scale prototype TackReach tidal energy device.

2 minutes read
  • LinkedIn
  • X
  • Email

Norway-based tidal energy developer, Tidal Sails, is preparing to conduct the final testing of its scale prototype TackReach tidal energy device.

The final trials are scheduled to take place from October 18-20, 2016, in Skjoldastraumen, Norway, Tidal Sails informed.

The scaled TackReach prototype has been under trials since August this year, during which the device delivered the electricity to the grid in several tidal cycles via regional grid operator Haugaland Kraft, according to Tidal Sails.

The scale structure being tested is 8 m long, with the overall weight of 4.2 tonnes.

The device consists of sails with self-adjusting and variable pitch SCS, steel structure supporting the mechanical components, chains, a generator with a rated capacity of 18.5kW that includes 2 gear boxes, and a control system with the required equipment to feed the electricity into the national grid.

It is a two station solution which operates with sails going back and forth – one sail leg is reaching with the current, and the other is tacking up against the current.

During the testing, the special attention was paid to monitoring the wake effect of the reaching sails, and how the tacking sails was influenced as they traveled in the opposite direction at high relative speed.

The full-scale TackReach device will be 500 m long with the rated capacity of 4MW.

It is expected to be deployed in 2017.

Take a look at the video showing the TackReach prototype supplying electricity to the national grid for the first time during testing.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Marine EnergyBusiness & FinanceOperations & MaintenanceResearch & DevelopmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1$50 billion South Korean investment pushes stalled Alaska LNG project closer to construction
  2. 2TGS on 3D imaging mission to unlock new insights into Malaysia's offshore discovery
  3. 3Petrobras strikes another oil-bearing zone in Equatorial Margin frontier
  4. 4MidOcean gets hold of $4 billion in major capital raise to fuel global LNG push

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free