Advertisement

Clean Fuel

about 9 years ago

Enagás boosts loading ops at Cartagena LNG terminal

Spanish LNG terminal operator, Enagás, carried out alterations at the Cartagena LNG terminal increasing the loading flow rate at the facility.

1 minutes read

Spanish LNG terminal operator, Enagás, carried out alterations at the Cartagena LNG terminal increasing the loading flow rate at the facility.

The loading flow rate has been increased to 7,222 cubic meters per hour, which, according to Enagás, is the highest flow rate of all LNG facilities in Spain.

In addition to the flow rate increase, the operator has cut the amount of boil-off gas produced during loading operations as well as the operating times.

Enagás noted that the decrease in BOG and installation of network delivery compressors ensures gas is fully recovered, eliminating shrinkage, while fees payable per tanker have been lowered due to shorter operating times.

The company further noted that the improvements have driven down the total cost of tanker loading at the Cartagena LNG terminal.

The Cartagena LNG terminal has a storage capacity of 587,000 cubic meters of LNG and is capable of receiving carriers with the capacity to transport 266,000-cbm.

Advertisement

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.