Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›TenneT Seeks Contractors for Hollandse Kust Zuid, Noord Offshore Platforms
Wind Farms

May 12, 2017 · about 9 years ago

TenneT Seeks Contractors for Hollandse Kust Zuid, Noord Offshore Platforms

TenneT has launched a qualification process for candidates interested in tendering for the delivery of offshore platforms that will connect wind farms at Hollandse Kust Zuid and Hollandse Kust Noord offshore areas to the Dutch grid on the mainland.

2 minutes read
  • LinkedIn
  • X
  • Email

TenneT has launched a qualification process for candidates interested in tendering for the delivery of offshore platforms that will connect wind farms at Hollandse Kust Zuid and Hollandse Kust Noord offshore areas to the Dutch grid on the mainland.

The scope of the intended contracts includes design, engineering, production, delivery, transport and installation of topsides and jackets.

Topsides will be 45m long, 21m wide, and 30m tall, and will have a weight of approx. 3,000 tonnes. The weight of the jackets is approx. 1,650 tonnes.

The Dutch offshore transmission system developer and operator will build five identical transformer stations with a total capacity of 3,500MW to transport wind energy to the Dutch onshore grid via HVAC subsea cables. The platforms within one area will be connected by means of a 66kV cable. The platforms will carry high-voltage switching and transformation equipment 220kV as well as auxiliary facilities. Intake power from the wind farms will be 66kV, export power from the platform will be 220kV.

The platforms were developed jointly with the wind farm developers, in an extensive consultation process based on an exchange of knowledge and experience. The standardization of the platforms will result in a substantial reduction of the costs of development, construction and maintenance, TenneT said last year as it presented the design for the offshore platforms.

The offshore grid will be rolled out in parallel with the development of the wind farms to ensure that the available capacity and the demand are optimally matched.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsProject & TendersStorage

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Venture Global and ConocoPhillips play the long game with 20-year LNG pact
  2. 2Egypt and Chevron seal Mediterranean oil & gas exploration deal
  3. 3Subsea battery system for offshore wind completes test before deployment
  4. 4$125M purchase: New owner to take over 178-meter subsea vessel next October

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free