Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Bids Invited for South Entrance Beach Project
Dredging

July 4, 2017 · about 9 years ago

Bids Invited for South Entrance Beach Project

The NSW Government is calling for tenders for the construction of a rock groyne to control erosion at South Entrance beach. Parliamentary Secretary for the Central Coast, Scot MacDonald MLC, said that the NSW Government has allocated $2 million to the project to increase the length of time that sand

1 minutes read
  • LinkedIn
  • X
  • Email

The NSW Government is calling for tenders for the construction of a rock groyne to control erosion at South Entrance beach.

Parliamentary Secretary for the Central Coast, Scot MacDonald MLC, said that the NSW Government has allocated $2 million to the project to increase the length of time that sand stays on the beach at The Entrance.

“The 100 meter long rock groyne will be constructed south of the Surf Life Saving Club tower and have a direct benefit for the entrance channel to Tuggerah Lakes and recreational beachgoers,” Mr MacDonald said.

“Work will involve the placement of around 6,000 tonnes of 2 to 4 tonne size rocks which will be transported by dump trucks to the site.”

The project will be managed by the Department of Industry (DoI) – Lands & Forestry and will also involve nourishment of the beach with sand dredged from the entrance channel and the completion of a report into making the channel deeper.

The call for tenders today follows extensive community consultation and a thorough review of environmental factors including local vegetation, fauna, traffic management, site safety, noise pollution, water quality and waste management.

Work is expected to be completed by the end of 2017.

[mappress mapid=”24248″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Woodside passes the baton for offshore gas project to Timor Gap in $200 million deal
  2. 2Fugro wins UXO survey contract for German offshore grid connections
  3. 3Accelerating operational excellence in offshore energy
  4. 4Go-ahead for North Sea wildcat clears path for Equinor’s drilling ops with COSL rig

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free