Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›MEPC Provisionally Accepts Scheme for Compliance with D-2 Standard
Shipbuilding

July 6, 2017 · about 9 years ago

MEPC Provisionally Accepts Scheme for Compliance with D-2 Standard

An amended implementation scheme for ships to comply with the D-2 biological standard under the Ballast Water Management Convention (BWMC) was tentatively accepted at the 71st session of the IMO Marine Environment Protection Committee (MEPC 71), American Bureau of Shipping (ABS) informed. The scheme

1 minutes read
  • LinkedIn
  • X
  • Email

An amended implementation scheme for ships to comply with the D-2 biological standard under the Ballast Water Management Convention ( BWMC ) was tentatively accepted at the 71st session of the IMO Marine Environment Protection Committee ( MEPC 71 ), American Bureau of Shipping (ABS) informed.

The scheme, if approved by the committee on July 7, will be circulated to member states for adoption during MEPC 72 scheduled to be held from April 9 -13, 2018.

Under the proposal, ships constructed on or after September 8, 2017 are to comply with the D-2 standard on or after that date.

Vessels built before September 8, 2017, are to comply with the D-2 standard at the first MARPOL IOPP renewal survey completed on or after:

If the survey per Reg B-3/10.1.2 is not completed, then compliance with the D-2 standard is required at the second MARPOL IOPP renewal survey after September 8, 2017, only if the first MARPOL IOPP renewal survey after September 8, 2017, is completed prior to September 8, 2019, and a MARPOL IOPP renewal survey was not completed on or after September 8, 2014, but prior to September 8, 2017 (Reg B-3/10.2).

For ships constructed before September 8, 2017 and which are not subject to the MARPOL IOPP renewal survey, compliance with the D-2 standard is required not later than September 8, 2024 (Reg B-3/5).

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem and Egypt’s MDC seal pact to target MENA offshore drilling market
  2. 2FEED job for Barents Sea FPSO topsides goes to Aibel
  3. 3Cook Inlet LNG steps up Alaska energy push with TDI-Brooks survey
  4. 4Nexans, Red Eléctrica to tie Mallorca and Menorca closer with new Balearic power link

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free