Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Spotted: USNS Hershel “Woody” Williams Floated Out
Shipbuilding

August 22, 2017 · about 9 years ago

Spotted: USNS Hershel “Woody” Williams Floated Out

On August 19, San Diego-based shipbuilder General Dynamics NASSCO completed the float-out for USNS Hershel “Woody” Williams, the second Expeditionary Sea Base (ESB) to be constructed for the US Navy. A float-out occurs when a ship is ready to be moved from a graving dock to a pier for the next phase

1 minutes read
  • LinkedIn
  • X
  • Email

On August 19, San Diego-based shipbuilder General Dynamics NASSCO completed the float-out for USNS Hershel “Woody” Williams, the second Expeditionary Sea Base (ESB) to be constructed for the US Navy.

A float-out occurs when a ship is ready to be moved from a graving dock to a pier for the next phase of construction. As part of the process, seawater flows into the graving dock, gradually raising the ship until it floats on its own.

Named after retired US Marine and Medal of Honor recipient, Hershel Woodrow “Woody” Williams, the 784-foot-long ship will serve as a flexible platform to support a variety of missions, including air mine countermeasures, counter-piracy operations, maritime security and humanitarian missions.

The ship will provide for accommodations for up to 250 personnel, a 52,000-square-foot flight deck, fuel and equipment storage, and will also support MH-53 and MH-60 helicopters with an option to support MV-22 tilt-rotor aircraft. The ship is expected to be completed in the first quarter of 2018.

The newbuilding is expected to be completed in the first quarter of 2018.

General Dynamics NASSCO has delivered three ships in the class to the navy – USNS Montford Point (ESD 1), USNS John Glenn (ESD 2) and USNS Lewis B. Puller (ESB 3). In addition to USNS Hershel “Woody” Williams (ESB 4), the fifth ship is under construction at NASSCO as part of the program.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Over 500 piles lay the foundation for Poland’s floating LNG terminal (Gallery)
  2. 2Australian gas project enters home stretch as developments in Mexico and US Gulf make new inroads
  3. 3SSE taps Seaway7 for Scotland-bound inter-array cables, foundations
  4. 4Infill drilling ops underway offshore Oman with November start-up in sight

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free