Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›First Arkona Monopiles In Place
Wind Farms

August 24, 2017 · about 9 years ago

First Arkona Monopiles In Place

E.ON has kicked off the offshore construction phase on the 385MW Arkona offshore wind project with the installation of the first of the 60 monopile foundations in the German Baltic Sea.

1 minutes read
  • LinkedIn
  • X
  • Email

E.ON has kicked off the offshore construction phase on the 385MW Arkona offshore wind project with the installation of the first of the 60 monopiles in the German Baltic Sea.

The monopiles were delivered by the Rostock-based EEW Special Pipe Constructions, while the transition pieces are produced by Denmark’s Bladt Industries.

The first transition pieces arrived at th e Mukran Port on Germany’s Rügen island last week.

E.ON and Statoil are building the EUR 1.2 billion Arkona wind farm in the German Baltic Sea, some 35 kilometres northeast of Rügen Island. E.ON is responsible for the construction and subsequent operation of the wind farm.

The wind farm will feature 60 Siemens 6MW turbines installed on monopile foundations in water depths of between 23 and 37 metres.

The foundations are being installed by Van Oord’s heavy lift installation vessel Svanen.

In terms of transport to the construction site, the monopiles are sealed at both ends, launched and floated to the construction site. There, the heavy-load crane ship Svanen hammers the 81-metre monopiles 40 metres deep into the seabed. A sound-proofing system ensures that the noise from this work is minimised for marine fauna, E.ON said.

Arkona, also known as Arkona-Becken Südost, is expected to be fully commissioned in 2019.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Rockhopper pledges $44 million for oil project’s second Falklands-bound FPSO
  2. 2Valaris rigs find more work in North Sea, Australia, and Suriname
  3. 3Coastal gridlock: California’s infrastructure ban and Gulf pushbacks trigger an energy tug-of-war
  4. 4Dutch design ultra-shallow-draft DSV for Gulf Region's oil & gas

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free