Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›Beatrice Foundation Piles Almost In Place
Wind Farms

November 6, 2017 · about 9 years ago

Beatrice Foundation Piles Almost In Place

Seaway Heavy Lifting’s crane vessel Stanislav Yudin has installed 84 out of the 86 sets of piles for jacket foundations on the Beatrice offshore wind farm in the Outer Moray Firth, Scotland.

1 minutes read
  • LinkedIn
  • X
  • Email

Seaway Heavy Lifting’s crane vessel Stanislav Yudin has installed 84 out of the 86 sets of piles for jacket foundations on the Beatrice wind farm off Scotland.

The piling works started in April, when Stanislav Yudin arrived at the site.

At a wind turbine location, each set of four piles for a jacket foundation are lifted, upended, lowered into the the Pile Installation Frame (PIF) installed on the seabed and then driven to final penetration by a piling hammer.

After all 86 pile sets are installed, Stanislav Yudin will re-mobilise to install the remaining jacket foundations after another SHL vessel, Oleg Strashnov, left the site in early October after installing 24 jackets.

Beatrice is located on the North Western point of the Smith Bank, approximately 13km off the Caithness coastline. The development site will cover an approximate area of up to 130km and will consist of 84 jacket substructures for Siemens 7MW turbines and two jacket foundations for two Siemens Offshore Transformer Modules.

The 588MW project – developed by a joint venture partnership between SSE (40%), Copenhagen Infrastructure Partners (35%) and Red Rock Power Ltd. (25%) – is expected to become fully operational in 2019.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Rockhopper pledges $44 million for oil project’s second Falklands-bound FPSO
  2. 2Valaris rigs find more work in North Sea, Australia, and Suriname
  3. 3Coastal gridlock: California’s infrastructure ban and Gulf pushbacks trigger an energy tug-of-war
  4. 4Dutch design ultra-shallow-draft DSV for Gulf Region's oil & gas

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free