Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›Jacket Installation Resumes at Beatrice Offshore Wind Farm
Wind Farms

November 14, 2017 · about 9 years ago

Jacket Installation Resumes at Beatrice Offshore Wind Farm

Seaway Heavy Lifting’s (SHL) vessel Oleg Strashnov will return to the Beatrice site on 16 November and will continue installing jacket foundations until mid-December, when it will leave the site once again and SHL’s vessel Stanislav Yudin will take over.

2 minutes read
  • LinkedIn
  • X
  • Email

Seaway Heavy Lifting’s (SHL) vessel Oleg Strashnov will return to the Beatrice site on 16 November and will continue installing jacket foundations until mid-December, when it will leave the site once again and SHL’s vessel Stanislav Yudin will take over.

In the first jacket foundation installation campaign, Oleg Strashnov has put in place 24 of the total of 86 jacket foundations, while Stanislav Yudin has been working on the piling for the jackets and has two more pile sets left to install.

Before a jacket is installed, the inside of the pile needs to be clean so that the grout bonds between the jacket stab in and the internal pile wall.

For this purpose, pile cleaning is undertaken prior to jacket installation to ensure there is no soil remaining on the inside surface of the pile after soil plug removal. Inside pile cleaning will be performed by means of a combination of steel brushes and high pressure water jets.

The jackets will be delivered to the Beatrice site in a vertical secured position on a cargo barge, which will be moored alongside Oleg Strashnov.

The heavy-lift vessel will then lift a jacket from the cargo barge onto its deck , from where the jacket is then lifted and lowered so that the connection between the seabed piles and the jacket legs is made before grouting is conducted.

The 588MW offshore wind farm will consist of 84 Siemens 7MW wind turbines and two Siemens Offshore Transformer Modules (OTMs), all placed on top of jacket foundations.

The first wind turbines are expected to be installed in summer 2018, with the wind farm anticipated to be commissioned by the end of 2019.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Rockhopper pledges $44 million for oil project’s second Falklands-bound FPSO
  2. 2Valaris rigs find more work in North Sea, Australia, and Suriname
  3. 3Coastal gridlock: California’s infrastructure ban and Gulf pushbacks trigger an energy tug-of-war
  4. 4Dutch design ultra-shallow-draft DSV for Gulf Region's oil & gas

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free