Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Draft EA for Benton-Washington Levee Available for Comment
Dredging

November 29, 2017 · about 9 years ago

Draft EA for Benton-Washington Levee Available for Comment

A draft environmental assessment (EA) for levee repairs (L-575 Benton-Washington levee system) along the left descending bank of the Missouri River near Hamburg, Iowa, is currently available for public review, reports the US Army Corps of Engineers, Omaha District. The draft EA evaluates the environ

1 minutes read
  • LinkedIn
  • X
  • Email

A draft environmental assessment (EA) for levee repairs (L-575 Benton-Washington levee system) along the left descending bank of the Missouri River near Hamburg, Iowa, is currently available for public review, reports the US Army Corps of Engineers, Omaha District.

The draft EA evaluates the environmental impacts of repairing damage to the levee caused by high flows in May 2017.

Repairs would include replacing lost earthen material along the riverside levee toe and compacting it to the appropriate slope along with planting grass seed via drill seeding and placing an erosion control blanket until vegetation is established.

Repairs will be completed under the Corps’ PL 84-99 Emergency Levee Rehabilitation Program.

BACKGROUND:

From February through April of 2017, above normal precipitation fell across southeast Nebraska and southwest Iowa along the Missouri River resulting in above normal soil moisture across the region. In May 2017, a significant series of heavy storms caused high flows along the Missouri River downstream of Omaha.

The increased soil moisture and early summer storms stressed the levee system resulting in levee toe erosion and vegetation to be killed on a portion of the L-575 left bank segment. Without repairs, erosion will continue during future high flows.

The deadline for sending comments is December 28, 2017.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Perenco brings ‘complex’ North Sea P&A and infrastructure removal campaign to an end
  2. 2LNG Canada entrusts Técnicas Reunidas with €200M+ EPCM deal
  3. 3FERC comes up with three-tiered fast track plan to streamline US LNG permitting
  4. 4OceanAlpha L42B marine survey uncrewed surface vessel (USV) receives Bureau Veritas Approval in Principle (AiP) certificate

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free