Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›Jumbo’s Fairplayer Installing Arkona TPs, Equipped with SMST Gangway
Wind Farms

December 4, 2017 · about 8 years ago

Jumbo’s Fairplayer Installing Arkona TPs, Equipped with SMST Gangway

Jumbo’s Heavy Lift Crane Vessel (HLCV) Fairplayer is now installing transition pieces (TPs) at the Arkona offshore wind farm. The vessel was outfitted with an SMST gangway shortly before the works started in early November, according to SMST.

1 minutes read
  • LinkedIn
  • X
  • Email

Jumbo’s Heavy Lift Crane Vessel (HLCV) Fairplayer is now installing transition pieces (TPs) at the Arkona offshore wind farm. The vessel was outfitted with an SMST gangway shortly before the works started in early November, according to SMST.

Since all of the transition pieces will be installed floating in DP2 mode , the use of a compensated gangway is necessary, SMST said, adding that continuous access provided by the modular Telescopic Access Bridge M Series supports the project’s efficiency for walk-to-work operations.

The installation of monopiles at the Arkona offshore wind farm site has been completed ahead of schedule, allowing for an early start of the installation of the transition pieces , produced by Bladt Industries, with all 60 expected be in place at the beginning of 2018.

In the spring of 2018, the offshore transformer station built in cooperation with the grid operator 50Hertz will be transported to the Arkona construction site and installed.

The installation of the 60 Siemens 6MW turbines is scheduled to start in 2018, and the Arkona wind farm is expected to be commissioned in 2019.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Rockhopper pledges $44 million for oil project’s second Falklands-bound FPSO
  2. 2Valaris rigs find more work in North Sea, Australia, and Suriname
  3. 3Coastal gridlock: California’s infrastructure ban and Gulf pushbacks trigger an energy tug-of-war
  4. 4Dutch design ultra-shallow-draft DSV for Gulf Region's oil & gas

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free