Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›VIDEO: Van Oord Wraps Up Caspian Sea Dredging Work
Dredging

December 21, 2017 · about 8 years ago

VIDEO: Van Oord Wraps Up Caspian Sea Dredging Work

Van Oord recently completed local dredging operations on a 72-kilometer long channel in the Caspian Sea. With this milestone, four years of dredging at an extremely remote location have been concluded, said the company. Van Oord built the new channel to allow for transportation of construction modul

1 minutes read
  • LinkedIn
  • X
  • Email

Van Oord recently completed local dredging operations on a 72-kilometer long channel in the Caspian Sea.

With this milestone, four years of dredging at an extremely remote location have been concluded, said the company.

Van Oord built the new channel to allow for transportation of construction modules to the Tengiz oil field in Kazakhstan, where new facilities are being erected to increase the production capacity.

Marine ingenuity

The remoteness of the location required resourceful measures during project execution. Due to the harsh winters, dredging was only possible between April and October. Furthermore, the region’s limited infrastructure and facilities made logistics unusually complex.

Four cutter suction dredgers, including the Ural River and Mangystau, have worked in formation to get the job done, assisted by more than 30 support vessels, said Van Oord.

To allow for in-situ repairs and maintenance of the support vessels, Van Oord designed and built a floating workshop barge complete with ship lift facility, hydraulic crane and on-board workshop.

Preserving wildlife

The area where dredging took place is home to various endangered species, such as birds and seals.

Van Oord closely cooperated with independent wildlife observers in order to protect the local flora and fauna.

In addition, 32 sand deposit sites were created alongside the access channel, 16 of which form islands to which animals are already finding their way to rest and breed.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceEquipmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Perenco brings ‘complex’ North Sea P&A and infrastructure removal campaign to an end
  2. 2LNG Canada entrusts Técnicas Reunidas with €200M+ EPCM deal
  3. 3FERC comes up with three-tiered fast track plan to streamline US LNG permitting
  4. 4OceanAlpha L42B marine survey uncrewed surface vessel (USV) receives Bureau Veritas Approval in Principle (AiP) certificate

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free