Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Phoenix Executes Subsea Campaign in Gulf of Mexico
Subsea

February 8, 2018 · about 8 years ago

Phoenix Executes Subsea Campaign in Gulf of Mexico

Phoenix has recently completed an abandonment campaign in the Gulf of Mexico utilizing its atmospheric diving system (ADS) Hardsuit and a surface supplied air diving spread mobilized onboard a vessel of opportunity. The project was executed in two phases. In Phase 1 of the project, Phoenix cut, plug

2 minutes read
  • LinkedIn
  • X
  • Email

Phoenix has recently completed an abandonment campaign in the Gulf of Mexico utilizing its atmospheric diving system (ADS) Hardsuit and a surface supplied air diving spread mobilized onboard a vessel of opportunity.

The project was executed in two phases.

In Phase 1 of the project, Phoenix cut, plugged and abandoned a 6” pipeline and umbilical exiting a J-tube at a depth of 530 feet. Cuts were made using a guillotine saw and shears, followed by the ADS pilots capping the umbilical, plugging the pipeline, and abandoning both segments in place as per the Bureau of Safety and Environmental Enforcement (BSEE) permit. An ADS pilot then drilled a 2” hole in the platform side of the cut pipeline using a magnetic drill and a messenger wire was deployed for the pilot to connect to the cut pipeline which was laid on the sea floor for subsequent recovery.

Phase 2 consisted of removing two 6” risers and all riser clamps, two 3” umbilicals and two umbilical I-tubes and all I-tube clamps to a depth of 430 feet. ADS pilots, using a standard hydraulic impact wrench opened and removed all clamps below 160 feet, while surface divers completed the same from 160 feet to the surface. The risers were then lifted out and cut into sections by a platform based construction crew with embedded Phoenix safety personnel.

In total, 20 ADS missions were completed with 61 hours in the water and divers performed 38 dives with 33 hours of total bottom time. The entire project was performed over 18 days using 3,964 man hours without a lost time incident, the company noted.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Mazarine taking the helm at Black Sea Oil & Gas as Carlyle and EBRD exit
  2. 2CNOOC’s 2026 run powered by 9 start-ups, 5 new oil & gas discoveries, and 23 appraisals
  3. 3Solstad vessel nets two subsea contracts in Asia Pacific
  4. 4Noble rigs’ $560 million drilling gigs push fleet backlog to $6.7 billion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free