Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›SeaTerra Keeps Trianel Windpark Borkum II UXO-Free
Subsea

March 14, 2018 · about 8 years ago

SeaTerra Keeps Trianel Windpark Borkum II UXO-Free

SeaTerra has completed UXO survey, investigation of targets and disposal of ordnance targets, at Trianel Windpark Borkum II offshore wind farm site. SeaTerra examined and cleared in recent weeks and months numerous metal objects from the future OWF Trianel Borkum West II. The project is going to est

2 minutes read
  • LinkedIn
  • X
  • Email

SeaTerra has completed UXO survey, investigation of targets and disposal of ordnance targets, at Trianel Windpark Borkum II offshore wind farm site.

SeaTerra examined and cleared in recent weeks and months numerous metal objects from the future OWF Trianel Borkum West II.

The project is going to establish 32 wind turbines with a capacity of 200 megawatt in an area of 33 square kilometers in the south‐western part of the German North Sea.

The distance to shore is 45 kilometers. The water depth is between 28 and 33 meters.

As part of the required UXO survey and target investigation, 11 major unexploded ordnance targets (7 buoyant mines, 2 ground mines, 1 depth charge and 1 bomb) were identified.

The ordnance targets were not transportable and therefore had to be demolished in situ by explosives specialists and ordnance divers of SeaTerra.

All demolitions were thoroughly prepared and designed in close cooperation with the responsible regulators. Marine mammals were protected by scaring devices and a “Big Bubble Curtain” to minimize noise.

The ordnance clearance operations were preceded by geophysical surveys. 427 hectares of the seabed (wind turbine locations, infield cable routes and anchor areas) were surveyed with high‐resolution magnetometers utilizing array systems (ROTV) or remote operated vehicles (ROV). Subsequent data interpretation led to the identification of hundreds of anomalies. SeaTerra identified 288 potentially dangerous objects and investigated and cleared them with the help of remote‐controlled devices (ROV, airlift), cranes and ordnance divers.

The UXO campaign was carried out with the vessels Mimer (ROTV survey), Vos Star (ROV survey and target investigation) and Olympic Challenger (target investigation).

The project ended on the March 12, with the last detonation of a buoyant mine.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Egypt’s energy infrastructure grows as two new offshore platforms slide into place
  2. 2Seaway7 completes inter-array cable installation at East Anglia Three offshore wind farm
  3. 3'Industry’s first’ energy construction vessel launches one year after construction start
  4. 4QatarEnergy locks in more US LNG through 20-year deal with Woodside

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free