Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›Oleg Strashnov to Install Arkona OSS in April
Wind Farms

March 27, 2018 · about 8 years ago

Oleg Strashnov to Install Arkona OSS in April

At the beginning of April, Seaway Heavy Lifting’s vessel Oleg Strashnov will install the 4,000-tonne Arkona topside onto its jacket foundation.

1 minutes read
  • LinkedIn
  • X
  • Email

At the beginning of April, Seaway Heavy Lifting’s vessel Oleg Strashnov will install the 4,000-tonne Arkona topside onto its jacket foundation.

STX France sent off the substation from its yard in Saint Nazaire to the German Baltic Sea three days after the jacket. The topside will travel to its destination site for around two weeks. On its journey, the substation will pass through the Bay of Biscay, then over the English Channel into the North Sea, and past the northern end of Denmark through Skagerrak and Kattegat to the construction site 35 kilometers northeast of German island of Rügen.

According to E.ON, Oleg Strashnov is currently the largest crane vessel available in the Baltic Sea and, by taking the topside from the barge to place it on top of the foundation, it will carry out the installation of the heaviest AC platform ever built in a single block.

The substation will collect the power generated by the turbines and transfer it to 50Hertz’s onshore substation in Lubmin via the 93-kilometre Ostwind 1 cable system. The offshore platform will be used simultaneously by the wind farm and the power grid operator 50Hertz.

Comprising 60 Siemens Gamesa wind turbines of the 6MW class, the EUR 1.2 billion offshore wind farm will have an output of 385MW and, from 2019 onwards, will be able to supply about 400,000 households with renewable energy.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Rockhopper pledges $44 million for oil project’s second Falklands-bound FPSO
  2. 2Valaris rigs find more work in North Sea, Australia, and Suriname
  3. 3Coastal gridlock: California’s infrastructure ban and Gulf pushbacks trigger an energy tug-of-war
  4. 4Dutch design ultra-shallow-draft DSV for Gulf Region's oil & gas

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free