Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Williams Shipping Begins MHI Vestas Blade Transport
Offshore Wind

April 24, 2018 · about 8 years ago

Williams Shipping Begins MHI Vestas Blade Transport

Southampton-based Williams Shipping has started transporting MHI Vestas’ 82-metre-long offshore wind turbine blades built at the Isle of Wight factory in the UK.

2 minutes read
  • LinkedIn
  • X
  • Email

Southampton-based Williams Shipping has started transporting MHI Vestas’ 82-metre-long offshore wind turbine blades built at the Isle of Wight factory in the UK.

According to Williams Shipping, a special design of blade transport barges was created since the blades cannot be transported by road and are instead transported by barge from the Isle of Wight to the painting facility in Fawley and then to international docks for shipping overseas.

The 76-meter-long barges are self-powered and capable of working in the shallow waters around the Solent, with an unloaded draught of 0.65m and a loaded draft of 0.75m, the company said.

Besides managing the operation of the vessels, Williams Shipping will be managing the stevedoring with cranes installed at local sites on the Isle of Wight, Fawley and Portsmouth Docks. The company said it has positioned cranes and site offices at each site to manage the stevedoring.

Williams Shipping won the contract in early 2018, while the blade transport barge was delivered to the company’s marine base at the Southampton Dock at the beginning of April.

Philip Williams , Director of Marine at Williams Shipping, said: “We’re really pleased to get started on this contract. We have spent some time getting all the equipment and people set up and the arrival of the blade barges was the final stage. MHI Vestas’ ongoing investment has been great for the area and we are glad we can play a part in building the wind energy industry on the south coast.”

In November 2017, MHI Vestas announced it will repurpose part of a decommissioned power plant in Fawley into a painting and logistics facility for the blades, which are used for the V164 offshore wind turbines with a nameplate capacity of up to 9.5MW.

The blades have been manufactured at the Isle of Wight factory since 2015, with serial production commencing last year. The facility is expected to produce around 150 blades yearly, according to MHI Vestas.

Images: Williams Shipping

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindOperations & MaintenanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Woodside passes the baton for offshore gas project to Timor Gap in $200 million deal
  2. 2Fugro wins UXO survey contract for German offshore grid connections
  3. 3Accelerating operational excellence in offshore energy
  4. 4Go-ahead for North Sea wildcat clears path for Equinor’s drilling ops with COSL rig

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free