Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Alternative Fuels›Sensor switch set for Bourne Tidal Test Site
Alternative Fuels

June 7, 2018 · about 8 years ago

Sensor switch set for Bourne Tidal Test Site

The MRECo operations team – together with those from the University of Rhode Island and Nortek – plans to replace sensors installed at the Bourne tidal site in an operation set for tomorrow.

2 minutes read
  • LinkedIn
  • X
  • Email

The MRECo operations team – together with those from the University of Rhode Island and Nortek – plans to replace sensors installed at the Bourne tidal site in an operation set for tomorrow.

At the site – located in Cape Cod Canal in Massachusetts – the teams will remove the two acoustic doppler current profilers and replace them with the freshly charged systems.

The data that is being collected is part of the research being conducted by Soroush Kouhi a PhD candidate at the University of Rhode Island to work out the details of how best to measure and characterize the water flow resource at tidal turbine sites.

According the organization in charge of site development – Marine Renewable Energy Collaborative (MRECo) – a diver will be dive in off the work boat in order to recover the Nortek Signature 500 Acoustic Doppler Current Profiler (ADCP).

Afterwards, a different ADCP – the Signature 1000 – so there will not be any down time waiting for data download, MRECo said.

Nortek is a Norwegian company that designs, develops and produces scientific instruments that apply the Doppler principle to underwater acoustics in order to measure water in motion – such as currents and waves.

The teams will have a second external battery canister loaded with batteries and the Signature 1000 will be programmed and compass calibrated at the ramp prior to heading out for the recovery at slack low, MRECo informed.

To remind, BTTS was installed in November 2017. The site is suitable for testing of tidal energy components or turbines of up to 3 meters in diameter with maximum output of 100kW.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Alternative FuelsTidal & Wave EnergyBusiness & FinanceOperations & MaintenanceResearch & DevelopmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1‘Major’ oil & gas player awards Shearwater with three-year contract off South America
  2. 2Noble’s 2013-built drillship scoops up 10-well job in Africa with Tullow Oil
  3. 3North Sea appraisal ops up the oil & gas discoveries’ projected size
  4. 4Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free