Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Naval Energies Sets Up Assembly Plant for Tidal Turbines
Subsea

June 21, 2018 · about 8 years ago

Naval Energies Sets Up Assembly Plant for Tidal Turbines

The world’s first assembly plant for OpenHydro tidal turbines was inaugurated in Cherbourg in the presence of numerous representatives of the Normandy authorities and foreign delegations. Built in ten months, this plant will start the production of the first two turbines for Canada and Japan. The pl

2 minutes read
  • LinkedIn
  • X
  • Email

The world’s first assembly plant for OpenHydro tidal turbines was inaugurated in Cherbourg in the presence of numerous representatives of the Normandy authorities and foreign delegations.

Built in ten months, this plant will start the production of the first two turbines for Canada and Japan.

The plant will also supply tidal turbines for all French commercial farms.

Hervé Morin, President of the Normandy Region and Ports Normands Associés (PNA), Marc Lefèvre, President of the Manche Département, Jean-Louis Valentin, President of the Communauté d’Agglomération du Cotentin and Benoît Arrivé, Mayor of Cherbourg-en-Cotentin, were attending the ceremony.

Chairman and CEO of Naval Energies and OpenHydro, Laurent Schneider Maunoury , said: “Today, Naval Energies is writing a new page in industrial history on the emerging market of tidal turbines. We have the capacity to build a tidal turbine of a diameter of 16 metres every two weeks. The priority for OpenHydro today is to ensure the success of the international demonstration projects and prepare the ramping up of the Normandie Hydro pilot project, in Raz Blanchard. Beyond that, we urgently need commercial visibility and hope for decisions from States, and in particular France, to launch a call for tenders for commercial farms.”

The plant’s activity should be progressively increased up to its maximum production throughput of 25 turbines/year.

The first two turbines that will be assembled in the plant are intended for Japanese and Canadian clients, Kyuden Mirai Energy and Cape Sharp Tidal, respectively. The continuation of the production should be taken by the Normandie Hydro project with a further seven turbines.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Eni gets the ball rolling on execution of Mediterranean gas project
  2. 2Reach Subsea and Eidesvik's 2009-built IMR vessel delivered to new owners
  3. 3Tight reservoirs on Equinor and Aker BP’s agenda amid Norway’s 2.8-billion-boe potential
  4. 4AI solutions to track wildlife at Welsh 30 MW tidal energy project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free