Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›EDS Executes 66kV Blyth Wind Farm Project
Subsea

August 3, 2018 · about 8 years ago

EDS Executes 66kV Blyth Wind Farm Project

High voltage engineering specialist, EDS HV Group (EDS), now part of James Fisher and Sons, has completed installation, termination and testing work at the Blyth Offshore Demonstrator wind farm (BOD). The BOD project has enabled owner and developer, EDF Renewables UK, to trial new technology and it

1 minutes read
  • LinkedIn
  • X
  • Email

High voltage engineering specialist, EDS HV Group (EDS), now part of James Fisher and Sons, has completed installation, termination and testing work at the Blyth Offshore Demonstrator wind farm (BOD).

The BOD project has enabled owner and developer, EDF Renewables UK, to trial new technology and it is the first offshore wind farm to be built upon gravity-based foundations.

The BOD is also the first offshore wind farm to use a 66kV cabling system. This is a critical development for the industry which should lead to more cost-effective power collection and transmission to shore, as well as being a crucial development in the push to continuously reduce the Levelised Cost of Energy, EDS explains.

EDS was able to provide the necessary expertise to complete 66kV terminations and testing on all 5 assets, along with fibre-optic termination and testing.

Ken Ritson , group managing director of EDS, said: “EDS was delighted to be chosen to assist EDF Renewables UK in the commissioning of this landmark project. We believe that 66kV will quickly become the industry norm and we are pleased to offer the necessary level of competence and experience required to manage this change within the industry.”

The offshore wind farm, located 5.7km off the North East coast, UK, has five turbines and has a generation capacity of 41.5 MW.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentOperations & MaintenanceResearch & Development

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Rig incident: 110 rescued, 5 still missing after Borr Drilling’s jack-up sinks off Gabon coast
  2. 2Yinson Production, PTSC cheer FSO’s first oil at Southeast Asian project
  3. 3DOF opts to sell 2018-built subsea vessel as attractive offer emerges
  4. 4Natural gas discovery springs up in India’s shallow waters

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free