Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Maersk rig riddled with non-conformities after long lay-up period
Fossil Energy

November 9, 2018 · about 8 years ago

Maersk rig riddled with non-conformities after long lay-up period

Norway’s Petroleum Safety Authority has conducted an audit of the Maersk Drilling-owned Maersk Reacher jack-up rig and found a number of non-conformities and improvement points.

2 minutes read
  • LinkedIn
  • X
  • Email

Norway’s Petroleum Safety Authority (PSA) has conducted an audit of the Maersk Drilling-owned Maersk Reacher jack-up rig and found a total of 20 of non-conformities and improvement points.

From 24 to 27 September 2018, the PSA carried out an audit in the domains of electrical facilities, technical safety, maintenance management, logistics and emergency preparedness on the Maersk Reacher rig.

The Maersk Reacher was built at the Keppel Shipyard in Singapore in 2009. The PSA noted that the rig has been laid up for a long period and has been contracted by Aker BP to function as a flotel at Valhall. The contract with Aker BP also includes options to undertake plugging activities using the rig.

The objective of the audit was to verify the technical condition and relevant aspects of the management system for monitoring compliance with the petroleum regulations, the safety agency said.

As a result of the audit, 13 non-conformities were identified relating to installation for uninterruptible power supply; electrical installations; work in and operation of electrical installations; lighting in the emergency hospital; firefighting system in machine rooms and other high fire risk rooms; ventilation and over-pressure in the living quarters; maintenance management; preservation; the maintenance system; management system logistics; emergency preparedness; analyses; and lockable cabin doors.

In addition, seven improvement points were identified relating to battery bank ventilation; performance standards; the alarm system and functions in CCR and ECR; local procedures for lifting operations; system for ensuring readiness of fire stations; reading of pressure in air tanks in the lifeboats; and evacuation from lifts.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyExploration & Production

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Sunda steps closer to dusting off 1985 gas field as New Zealand bid goes exclusive
  2. 22010-built DOF CSV wins one-year contract extension
  3. 3French engineering company acquires Irish Sea Contractors to expand offshore wind and cable services
  4. 4Petrobras lands $859 million payout from oil fields deal with Shell, TotalEnergies, and Petrogal

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free