Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Milestone for New IJmuiden Sea Lock Project
Dredging

November 15, 2018 · about 8 years ago

Milestone for New IJmuiden Sea Lock Project

A major milestone has been achieved in the construction of the new IJmuiden sea lock, with the successful immersion of the caisson for the outer lock head into its final position, informs Royal BAM Group. The caisson, in and out of which the lock gates will slide, is the size of an apartment buildin

2 minutes read
  • LinkedIn
  • X
  • Email

A major milestone has been achieved in the construction of the new IJmuiden sea lock, with the successful immersion of the caisson for the outer lock head into its final position, informs Royal BAM Group.

The caisson, in and out of which the lock gates will slide, is the size of an apartment building, 80 meters long, 26 meters wide and 22 meters high. Over recent months it has been immersed centimeter by centimeter to the right depth, in a controlled manner, as planned.

The caisson was sunk into the ground using remote-controlled robotic arms to remove the underlying sand. This fully automated process was monitored 24/7 using sensors, measuring instruments and cameras installed underneath the caisson. The next step will be to fill the space beneath the caisson with concrete.

In 2019, the inner lock head caisson – measuring 80 meters long, 55 meters wide and 25 meters high – will be immersed into its final position using the same method.

New sea lock IJmuiden

Work has been underway in IJmuiden since 2016 to construct the world’s largest sea lock, which will accommodate increasingly large seagoing vessels. The new lock, which will be 500 meters long, 70 meters wide and 18 meters deep, is a joint project between the Dutch Ministry of Infrastructure and Water Management, the province of Noord-Holland, the municipality of Amsterdam, Port of Amsterdam and the municipality of Velsen.

Commissioned by Rijkswaterstaat, the new sea lock is being built by contracting consortium, OpenIJ.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Yinson Production achieves industry-first non-Brazil FPSO project bond at $1.46 billion
  2. 2Golar secures 2013-built LNG carrier for conversion into fourth FLNG
  3. 3Lamprell tasks IMI with offshore platform and jacket fabrication scope
  4. 4'World-first' CCS platform for industrial decarbonization stands tall offshore UK

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free