Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›FERC issues draft EIS for Eagle LNG’s Jacksonville project
Clean Fuel

November 19, 2018 · about 8 years ago

FERC issues draft EIS for Eagle LNG’s Jacksonville project

The United States Federal Energy Regulatory Commission has readied a draft environmental impact statement (EIS) for the Eagle LNG Partners’ proposed Jacksonville project.

1 minutes read
  • LinkedIn
  • X
  • Email

The United States Federal Energy Regulatory Commission has readied a draft environmental impact statement (EIS) for the Eagle LNG Partners’ proposed Jacksonville project.

Eagle LNG intends to build and operate a liquefied natural gas facility on the north bank of St. Johns River in Jacksonville, Florida, capable of producing 1 million tons of the chilled fuel per year.

The facility will also include a 45,000-cbm LNG storage tank and truck loading facilities capable of loading 260 to 520 LNG trucks per year.

Feed gas would be delivered from a new 120-foot-long non-jurisdictional natural gas pipeline constructed by Peoples Gas, a unit of TECO Energy, connected to its existing local gas distribution transmission pipeline, which is immediately adjacent to the proposed terminal site.

The draft EIS assesses the potential environmental effects of the construction and operation of the Jacksonville project, FERC said in a filing.

FERC concluded that approval of the Jacksonville project would result in some limited adverse environmental impacts, however, these impacts would be reduced to less-than-significant levels with the implementation of Eagle LNG’s proposed mitigation and the additional measures.

FERC invited comments on the draft EIS to be delivered by January 7, 2019.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Yinson Production, PTSC cheer FSO’s first oil at Southeast Asian project
  2. 2DOF opts to sell 2018-built subsea vessel as attractive offer emerges
  3. 3Natural gas discovery springs up in India’s shallow waters
  4. 4Prysmian's 193-meter CLV Alessandro Volta performing sea trials

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free