Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Offshore watchdog looks into Neptune’s Fenja project
Fossil Energy

November 22, 2018 · about 8 years ago

Offshore watchdog looks into Neptune’s Fenja project

The PSA has found an improvement point during an audit of production pipes for Neptune’s Fenja field off Norway.

2 minutes read
  • LinkedIn
  • X
  • Email

Norwegian offshore safety watchdog, the Petroleum Safety Authority (PSA), has found an improvement point during an audit of production pipes for Neptune’s Fenja field off Norway.

The offshore safety body said on Thursday that the audit was conducted on October 8, 2018.

According to the PSA, it is planned to develop the Fenja field using flowlines employing new technology in the form of electrically trace heated (ETH) pipe-in-pipe.

The objective of the audit was to monitor that qualification, production, and testing of flowlines for Fenja were carried out in accordance with established requirements and standards.

Part of the task was also to audit how the operator was exercising its supervisory duty with regard to the supplier TechnipFMC.

The PSA said that there were no non-conformities found during the audit while the safety watchdog identified one improvement point relating to the lack of documentation of the choice of the recognized standard within the electrical facilities.

Neptune was told to report on how the improvement point would be addressed by December 18, 2018.

Fenja

Fenja is located in the Norwegian Sea some 35 kilometers southwest of the Njord field. Water depth in the area is 325 meters. The field was proven in 2014, and the plan for development and operation (PDO) was approved in April 2018.

The development solution consists of two subsea templates with a total of six wells tied back to the Njord A facility. Production is expected to begin in late 2021.

The field contains recoverable resources of approximately 100 million barrels oil equivalents, mostly oil (11.0 million standard cubic meters of oil, 3.4 billion standard cubic meters of gas and 0.57 million tonnes of NGL).

It is worth noting that Neptune Energy became the Fenja operator following the purchase of VNG’s Norwegian subsidiary VNG Norge. The deal was announced on June 28 and completed on Friday, September 28 .

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Over 500 piles lay the foundation for Poland’s floating LNG terminal (Gallery)
  2. 2Australian gas project enters home stretch as developments in Mexico and US Gulf make new inroads
  3. 3SSE taps Seaway7 for Scotland-bound inter-array cables, foundations
  4. 4Infill drilling ops underway offshore Oman with November start-up in sight

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free